Innovative Offshore HVDC Converter Platform Concept
How to manufacture and lift topsides with over 15,000 tons?
Company / Unternehmen: IMPaC OFFSHORE ENGINEERING GmbH
Speaker / Referent: Uwe Gierer
Position: Project Management
Abstract English:
Designed as semi-float-over principle: Transport & Installation with standardized North-Sea barge, connection of topside and jacket above sea-level, avoidance of heavy-lift crane vessel, modular naval topside construction with optional base frame, use of conventional „state-of-the-art techniques for grouted, welded and wedged connections, reduction of dynamic wind-loads on overall structure by more flatened topside design, minimization of fabrication costs by significant reduction of structural weight and enclosed space, optimized arrangement of electrical equipment with respect to energy efficiency, safety and easy of operation & maintenance, improved ergonomics by natural illuminated living and work spaces on deck
Abstract German:
Design nach dem Semi-Float-Over Prinzip: Transport & Installation mit Standard Nordsee-Barge, Verbindung Topside-Jaclet über Wasser, Verzicht auf Schwerlastkranschiffmodulare schiffbauliche Topside-Konstruktion und optionaler modularer Baseframe, Einsatz konventioneller „State-of-the-Art“ Technologien bei Grout-, Keil- und Schweißverbindungen, Verringerung der dynamischen Windlasten auf die Gesamtstruktur durch flacheres Topside-Design, Senkung der Herstellungskosten durch signifikante Reduzierung des strukturellen Gewichts und des umbauten Raums, optimierte Anordnung der Prozess-Anlagen im Hinblick auf Energieeffizienz, Sicherheit sowie auf Betriebs- und Wartungsfreundlichkeit, verbesserte Ergonomie durch tagesbelichtete Wohn- und Arbeitsräume an Deck